We streamline the deliverables that consume most study-phase budgets, including equipment sizing, datasheets, mechanical equipment lists, and AACE Class 4 cost estimates.
Two phases. Five business days each. AACE Class 4.
Engineering and estimate deliverables are produced in two five-day phases, with principal-engineer review running concurrently.
Engineering
Mechanical design package: process inputs translated into sized equipment, vendor ready datasheets, and a structured equipment register.
CAPEX Estimate
Class 4 capital cost estimate prepared from the engineering package. Budgetary pricing built up to a fully documented basis of estimate.
Beneficiation. Hydrometallurgical. Pyrometallurgical.
Beneficiation
Physical separation and concentration of valuable minerals from gangue.
Hydrometallurgical
Aqueous chemistry to dissolve, purify, and recover target metals.
Pyrometallurgical
High-temperature processes for reduction, refining, and recovery.
AACE 18R-97 compliant.

Market Equity.
Strategic advisor and stakeholder. Board-level guidance on business strategy, capital structuring, and commercial growth.
Founded in Perth in 1992, Market Equity grew to become one of the largest private consultancies in Australia and New Zealand before its 2005 acquisition by London Stock Exchange listed Aegis PLC.
marketequity.com.au ↗